STATEMENT OF WORK DRIVEWAY REPAIR AND .
The work consists of milling, sweeping and overlaying the entire Front CAC driveway and parking area with a 1 ½ inch compacted lift of asphalt. Major Milling work shall be done with a selfpropelled grinding machine capable of removing 7ft of the asphalt in a single pass at a depth ranging from 1 to 2 inch. Minor